A double-curved steel bridge was installed over the Sittard-Maastricht railway line near the Fortuna Industrial Estate. This 112-tonne bridge was installed in position in a single operation. The bridge has integrated semi-transparent balustrades and a total of 2 km of welding.
Jos van den Bersselaar Construction BV is an independent steel construction company. We specialise in light constructions for numerous applications and with a high level of finishing. For 58 years, we have delivered products, such as stairs, balustrades, canopies, sound barriers and bridge railings, to clients in the infrastructure and utilities sectors, industry and waste water.